Providing , Laying , Installation,Testing & Commissioning of 33 KVA Underground Cables and Associated Works for Power Supply at Koulva,Bhopal

AMOUNT
Rs. 10,671,624

INITIATION DATE
03-08-2013

COMPLETION DATE
02-02-2014

WORK STATUS
Complete

Office of the

DEWAS MUNICIPAL CORPORATION,DEWAS

DEWAS (MP)

Central Light Shifting of LT line 11 k.v. And 33 k.v. HT line for MR-03, MR-08 and Motibunglow Main Road Under Chief Minister Urban Infrastructure Development Scheme.

  • Street Light Pole (concial hotdip galvalized pole – 137 Nos.
  • Led Street Light 48walt Luminaire Philips make – 272 Nos.
  • Underground LT 3 core 10sqmm – 6.206 km armored XLPE Cable
  • 33kv line Double Circuit on 13 mtr H – Beam – 4.250 km.
  • 11kv line on 11 mtr. H – beam – 1.650 km.
  • LT line on 9 mtr. RSJ – 0.650 km.
  • Installation of 11kv 100kva, 63kva Distribution Transformer – 02 Nos, 01 Nos.

AMOUNT
Rs. 16,141,784

INITIATION DATE
07-08-2013

COMPLETION DATE
05-11-2014

WORK STATUS
Complete

OFFICE OF THE

BHOPAL DEVELOPMENT AUTHORITY

BHOPAL M.P.

Turnkey basis the work of External Electrification Work of Rajabhoj Awasiya Yojna Godremau Phase-2 vide contract award

  • 1) 33 / 11KV Power Transformer 8 – MVA & 5 – MVA : 1 Nos.
  • 11KVDistribution Transformer 200 KVA & 100 KVA : 30 Nos. & 06 Nos. resp.
  • 11kV 800Amp, 13KA VCB : 10 Nos.
  • 33kV 1250Amp 25KV VCB : 4 Nos.
  • 33kV Transmission Line : 6.85 km
  • 11kV Transmission Line : 6.14 km
  • 11KV-1200KVAR Capacitor Bank : 2 Nos.
  • LT A.B.Cable 3×120 + 1×70 + 1×16 : 30.40 km
  • HT 11kv underground cabling : 1.25 km 3CX300Sqmm & 3CX150sqmm
  • Street Light & Pole 9 mtr long : 50 Nos.

AMOUNT
Rs. 128,792,693

INITIATION DATE
18-09-2013

COMPLETION DATE
02-09-2016

WORK STATUS
Complete

OFFICE OF THE

MUNICIPAL CORPORATION

Zone 12 Govindpura BHEL, Near Tatpar Petrol Pump Bhopal(M.P.)

Turnkey basis the work of External Electrification Work for providing power supply to 960 Nos. domestic light & fan connection at Rahul Nasgar on new proposed 11KV Rahul Nagar feeder under Kotra Zone City Division (S) Bhopal.

  • 11KV Distribution Transformer 100 KVA – 16 Nos.
  • 11KV line works – 2.05 KM.
  • LT Line ABC Cabling – 5.50 KM.
  • 11kV 800Amp, 13KA VCB – 01 Nos.
  • 11KV Feeder Bay – 01 Nos.

AMOUNT
Rs. 10,912,297

INITIATION DATE
19-12-2013

COMPLETION DATE
17-04-2015

WORK STATUS
Complete

OFFICE OF THE

BHOPAL DEVELOPMENT AUTHORITY BHOPAL M.P.

BHOPAL M.P.

Turnkey basis the work of External Electrification Work of Sahid Bhagat Singh Nagar ( Abbas Nagar).

  • 11KVDistribution Transformer 200 KVA : 04 Nos.
  • 11KVDistribution Transformer 100 KVA : 05 Nos.
  • 11kV Line : 02 km
  • L.T.Undereground Cable : 6.96 km
  • Street Light Pole : 40 Nos.

AMOUNT
Rs. 13,077,698

INITIATION DATE
08-12-2014

COMPLETION DATE
17-07-2015

WORK STATUS
Complete

OFFICE OF THE

SUPERINTENDING ENGINEER ( EMC ) SHREESINGAJI THEREAL POWER

M.P.P.G.C .I. , Dongalia, Khandwa (M.P.)

Design , Engineering , Supply , Erection , Installation , Testing & Commissioning of electrification of street light point from SSTPP Plant main gate to Dinkarpura Shivariya road junction ( approx 12.525 kms ) at 2x600MW SSTPP , MPPGCL , Dongalia , Dist . Khandwa ( MP ) against MPPGCL’s

  • H-beam 152x152mm 37.0 kg/11mtr. Long : 70 Nos
  • AAAC Conductor Raccoon : 15 km
  • 110 volts Grade Arial bunched Xlpe Cable 3×50+1×16+1×35 sq.mm.: 26 km
  • H.P. Sodium Vapour Side Road lighting of single. Piece cast aluminium housing complete with all accessories including 150W HPSV lamps : 745 Nos.
  • Distribution Transformer 11kv / 0.433 : 2 Nos 7. Street Light Timer Control Panel : 2 Nos.
  • 12 Km Street Light Tubular Pole 410SP-32 9mtr.long : 745 Nos.

AMOUNT
Rs. 281,022,131

INITIATION DATE
23-01-2015

COMPLETION DATE
04-10-2015

WORK STATUS
Complete

Government of Madhya Pradesh

Public health engineering Department Division Ujjain M.P

Ujjain M.P

Work of Providing, Laying, Jointing of 100 MM to 500MM dia DWG-HDPE class SN – 8 sewer in a length of 34386 mtr. Alongwith HDPE and Brick masonry manholes, construction of RCC sumps, providing and installation of non-clog sewage submersible motor pumps alongwith panels,and required pipes,accessories,poroviding and erection of generator set on hire basis, laying jointing of 500mm dia DI class K-9 pumping main including all works pertaining to successful completion of proposal , testing,commissioning, and operation & maintenance of sewerage network in Simhastha Kumbh Mela 2016 at Ujjain (M.P)

Providing, supplying, laying in proper alignment and slope, jointing and testing i.c. cost of jointing material of DWC HDPE pipes of class SN 8 100 mm, 135 mm, 170 mm, 250 mm 400 mm & 500 mm sewers renowned duly tested. : 62897.35 Mtr.

AMOUNT
Rs. 82,966,800

INITIATION DATE
13-10-2015

COMPLETION DATE
14-05-2016

WORK STATUS
Complete

Government of Madhya Pradesh

Public health engineering Department

Ujjain M.P

Design,Modification,Supply,erection,testing and Commissioning of 2 x 2000KVA,33KV/3.3KV Transformer Electric Sub-station with Water Pumping Stations (2×7.5 MGD , 110m head & 2×5.0 MGD,110 m head) at Ambodiya with accessories under Water Supply arrangements, operation and maintenance for Simhastha Mela 2016 at Ujjain (M.P)

  • 33kv / 0.433KV Distribution Transformer 2000KVA : 2 Nos
  •  33KV / 800 Amp, Vacuum Circuit Breaker : 3 Nos
  • 33Kv 1 SF – 6 Indore Panel incomer – 2 nos, buscoupler 1 No. with 2 Nos.
  • Battery & Battery Charger : 1 Set
  • 33kV Xlpe cable 3Cx120 sqmm Al, armored : 150 mtr
  • 10×500 sqmm Al armored cable : 1372 mtr.
  • 3.5Cx240 & 400 sqmm Al armored cable : 1126 mtr.& 1365 mtr. resp.
  • 4Cx2.5sqmm Cu.ar.cable : 484 mtr.
  • 3 & 19 Cx2.5 sqmm Cu.ar, cable : 200 mtr.&416 mtr.respectively

AMOUNT
116.80 Lakhs

INITIATION DATE
28-12-2015

COMPLETION DATE
25-03-2016

WORK STATUS
Complete

M.P. Madhya Kshetra Vidyut Vitran Co. LTD.

Gwalior

Award for Turnkey Contract (Supply and Erection ) For Strengthening of 33 KV Double Circuit Transmission Sub Transmission and Distribution Network which enter-alia include construction of New 33KV Double Circuit lines om Monopole and other associated work in Gwalior (City ) Circle (Lot-VII A ) Gwailor City Towns of under IPDS Project.

  • Supply, Installation, Testing & Commissioning of Monopole 14 meter long & 17 meter long along with its accessories & Civil Work a) 14 meter long monopole : 54 Nos. b) 17 meter long monopole : 30 Nos.
  • Supply, Installation, Testing & Commissioning of 33 KV Double Circuit ACSR Panther Conductor : 4.738 km. (a) 33 KV Line HT underground cable laying 400×3 core : 0.560 km.

AMOUNT
Rs. 96,083,976

INITIATION DATE

26-04-2017

COMPLETION DATE
27-02-2019

WORK STATUS
Complete

OFFICE OF THE

Nagar Palika Parshad, Khargone

Khargone (M.P.)

Construction of LIG 120 Unit Houses G+3 and type block houses and related development Including building Construton at Satya Vistar, the work as follows :- Sewerage line, water supply line, & internal electrifications works, etc.

a) Total Built – up Area : 12729.60 sqmtr. b) RCC Work M – 20 : 3692.20 cum. c) PCC Work M – 15 : 482.90 cum. d) Structural Steel : 608.53 MT. e) Excavation work : 4298.61 cum.

AMOUNT
Rs. 130,125,000

INITIATION DATE
01-06-2017

COMPLETION DATE
13-01-2020

WORK STATUS
Complete

M.P.Madhya Kshetra Vidyut Vitran Co. LTD.

Gwalior

Award for Turnkey Contract (Supply and Erection ) For Strengthening of 33 KV Double Circuit Transmission Sub Transmission and Distribution Network which enter-alia include construction of New 33KV Double Circuit lines om Monopole and other associated work in Gwalior (City ) Circle (Lot-VII A ) Gwailor City Towns of under IPDS Project.

1. 33KV Line on 17mtr. Iong Monopole / 15 Mtr. Long H Beam (33KV Line with Dog Conductor 9.2 km.) : 10 Nos./124 Nos. 2. 11KV Line AAAC Raccoon Conductor : 8.1 km 3. Distribution Transformer Plinth Mounted : 5 Nos. 4 Underground 3.5 core 300 sqmm Armored (XLPE) Cable : 4.08 Km. 5. Underground 3.5 core 400 sqmm Armored (XLPE) Cable : 8.21 km. 6. Underground 3.5 core 185 sqmm Armored (XLPE) Cable : 2.75 km. 7. Underground 3.5 core 150sqmm Armored (XLPE) Cable : 2.05 km. 8. Underground 4 core 16 sqmm Armored (XLPE) Cable : 0.50 Km. 9. Underground 4 core 10 sqmm Armored (XLPE) Cable : 0.50 Km. 10. Underground 1/2 / 3.5 core 25sqmm, 35sqmm, 50sqmm, 70sqmm, 95sqmm 120sqmm etc. : 3.26 Km. 11. 500 KVA 415 volts Diesel Generator with AMF: 03 Nos 12. 33 KV VCB with C.R. Panel : 02 Nos. 13. Main Panels, Syn. Panels, Main Adm. Panels : 52 Nos. 14. Supply & fixing of Cable Tray 300×50 & 600×50 : 300 Nos.

AMOUNT
Rs. 74,972,721

INITIATION DATE
25-07-2017

COMPLETION DATE
25-02-2020

WORK STATUS
Complete

OFFICE OF THE

Executive Engineer ( Elect . )

M. P. Housing and Infrastructure Development Board Division Electrical , Bhopal

External Electrification work including SITC of 33 / 0.433KV , 2x1500KVA Outdoor Sub – Station and SITC of 3x500KVA and 1x100KVA DG set for MCNUJC at Bisankhedi , Bhopal

1. 33KV Line on 17mtr. Iong Monopole / 15 Mtr. Long H Beam (33KV Line with Dog Conductor 9.2 km.) : 10 Nos./124 Nos. 2. 11KV Line AAAC Raccoon Conductor : 8.1 km 3. Distribution Transformer Plinth Mounted : 5 Nos. 4 Underground 3.5 core 300 sqmm Armored (XLPE) Cable : 4.08 Km. 5. Underground 3.5 core 400 sqmm Armored (XLPE) Cable : 8.21 km. 6. Underground 3.5 core 185 sqmm Armored (XLPE) Cable : 2.75 km. 7. Underground 3.5 core 150sqmm Armored (XLPE) Cable : 2.05 km. 8. Underground 4 core 16 sqmm Armored (XLPE) Cable : 0.50 Km. 9. Underground 4 core 10 sqmm Armored (XLPE) Cable : 0.50 Km. 10. Underground 1/2 / 3.5 core 25sqmm, 35sqmm, 50sqmm, 70sqmm, 95sqmm 120sqmm etc. : 3.26 Km. 11. 500 KVA 415 volts Diesel Generator with AMF: 03 Nos 12. 33 KV VCB with C.R. Panel : 02 Nos. 13. Main Panels, Syn. Panels, Main Adm. Panels : 52 Nos. 14. Supply & fixing of Cable Tray 300×50 & 600×50 : 300 Nos.

AMOUNT
Rs. 74,972,721

INITIATION DATE
25-07-2017

COMPLETION DATE
25-02-2020

WORK STATUS
Complete

M.P.

Madhya Kshetra Vidyut Vitran Co. LTD.

Gwalior

Award for turnkey contract ( Supply and Erection ) for Strengthenin of Sub-transmission and Distribution Network in Gwalior ( M.Corp) and Morar Contt. Towns of Gwalior ( City ) Circle Lot-VII of Gwalior ( City ) Circle Lot-Vii ( HT works of Gwalior Region of MPMKVVCL Bhopal ( M.P.) Under Integrated Power Development Scheme (IPDS)”

a) 33/11 KV Substation (5 MVA) : 01 Nos b) 33/11 KV Power Transformer, OFTC Type, 5000 KVA Loss (4 KW + 23 KW) (Additional) : 01 Nos c) 33/11 KV Power Transformer, OFTC Type,s 8000 KVA (Loss 5.5 + 40 KW) for Augmentation : 04 Nos d)BIS Certified Level – 3, 100 KVA, 11 / 0.4 KV, Three phase AL Winding Distribution Transformer : 01 Nos e)33 KV Line : 18.101 km f) 11 KV Line : 7.292 km g) 33 KV HT XLPE Cable for underground Railway Crossing : 2.067 km h) 33 KV New Bay : 08 Nos.

AMOUNT
Rs. 1191.48 Lakhs

INITIATION DATE

04-09-2017

COMPLETION DATE
25-03-2019

WORK STATUS
Complete

SMART CITY DEVELOPMENT CORPORATION LIMITED

Bhopal

Design,supply, Installation, Testing and commissioning of 33/0.4 KV 2x1500KVA Dry type Indoor transformer Substation with 2×500 KVA DG set, with 3 year O&M and other Electrical Works for Incubation Center Building Bhopal

a) CSS with 33 / 0.4 1500KVA Dry Type Transformer : 02 Nos b) D.G.Set 500KVA : 02 Nos c) Power and Control Panels : 13 Nos. d) APFC PANEL (500KVAR) : 02 Nos. e) 33Kv HT XLPE Cable 30x300Sq mm : 1.2 Km (2 Run) f) 11Kv HT XLPE Cable 3Cx185 Sq mm: 0.25 Km (2 Run) g) LT Armored XLPE Cable 3.5Cx300sqmm & 3.5Cx150sqmm : 1.8 km

AMOUNT
Rs. 506.55 Lakhs

INITIATION DATE
21-03-2018

COMPLETION DATE
08-05-2018

WORK STATUS
Complete

SMART CITY DEVELOPMENT CORPORATION LIMITED

Bhopal

Design,supply,installation,Testing and Commissioning of Decorative Lighting System for Bhopal Lake Beautification Bhopal.

a) Lighting pole (RGB) height 6mtr including Architectural RGB Lighting on front & back side of the pole with top Marker Light : : 200 Nos b) DMX Master Controller panel : 01 Set c) 4Cx16 Sq mm and 4Cx10 Sq mm Armored LT cable : 6.5 km d) 12 Core OFC Cable : 9.8 Km e) Smart Control GSM / Timer Panel: 4 Nos. f) Double Wall Corrugated Pipes for: 5.5 Km (2 Run)

AMOUNT
Rs. 784.76 Lakhs

INITIATION DATE
03-10-2018

COMPLETION DATE
25-04-2019

WORK STATUS
Complete

SMART CITY DEVELOPMENT CORPORATION LIMITED

Bhopal (M.P.)

Civil work, Road and development for Solid Waste transfer stations at various location of Bhopal City

  • PEB Shade (49x24Sq Mtr And 38×23 Sq Mtr) : 2050 Sq Mtr.
  • P.C.C. M – 15 Grade work : 339.86 cum
  • R.C.C.M – 25 Grade work : 348.78 cum
  • D.L.C : 1070.21 cum
  • PQC M40 : 2287.01 cum

AMOUNT
Rs. 758.91 Lakhs

INITIATION DATE
05-10-2018

COMPLETION DATE
25-03-2019

WORK STATUS
Complete

SMART CITY DEVELOPMENT CORPORATION LIMITED

Bhopal (M.P.)

Construction and Development of HAAT BAZAAR under Smart City Area Based Development consisting of works RCC, Architectural Finishes, MEP Services, and Landscape works including operation & maintenance of project for 3 years.

Construction and Development of HAAT BAZAAR under Smart City Area Based Development consisting of works RCC, Architectural Finishes, MEP Services, and Landscape works including operation & maintenance

AMOUNT
Rs. 343,416,984

INITIATION DATE

05-10-2018

COMPLETION DATE
25-03-2019

WORK STATUS
Complete

SMART CITY DEVELOPMENT CORPORATION LIMITED

Bhopal (M.P.)

Design, Supply, Installation, Testing and Comissioning of Decorative Lighting System and External Electrification with 3 Years O & M and other electrical work for Sadar Manzil , Bhopal.

Design, Supply, Installation, Testing and Comissioning of Decorative Lighting System and External Electrification with 3 Years O & M and other electrical work for Sadar Manzil , Bhopal.

AMOUNT
Rs. 36,444,800

INITIATION DATE
05-10-2018

COMPLETION DATE

WORK STATUS

MADHYA PRADESH STATE

TOURISM DEVELOPMENT CORPORATION LTD.

Bhopal (M.P.)

Illumination work for Jahangir Mahal, Chaturbhuj Mahal, Sheesh Mahal and Orchha Chhatries orchha. Dist. Niwari

Illumination work for Jahangir Mahal, Chaturbhuj Mahal, Sheesh Mahal and Orchha Chhatries orchha. Dist. Niwari

AMOUNT
Rs. 261.00 Lakhs

INITIATION DATE

12-12-2019

COMPLETION DATE
31-07-2020

WORK STATUS
Complete

MADHYA PRADESH STATE

TOURISM DEVELOPMENT CORPORATION LTD.

Bhopal (M.P.)

Supplying, installation, testing and commissioning of Illumination of temporary lighting at Sunder mahal Sunderbaba ki dargha, Rai Praveen Mahal Raja Mahal outer facade Orchha Gates and Lamxinarayan Temple Orchha. Dist.Niwari

Supplying, installation, testing and commissioning of Illumination of temporary lighting at Sunder mahal Sunderbaba ki dargha, Rai Praveen Mahal Raja Mahal outer facade Orchha Gates and Lamxinarayan Temple Orchha. Dist.Niwari

AMOUNT
14.60 Lakhs

INITIATION DATE

04-02-2020

COMPLETION DATE
03-03-2020

WORK STATUS
Complete